contact

Waste Water Treatment Plant

As part of the extensive refurbishment of Rugeley Power Station, Wright Brothers were contracted by Lentjes UK to install all the major equipment associated with the Waste Water Treatment Plant on the Station.

Our Site Team installed all pumps, tanks, silos and additive dosing equipment as well as maintenance access and stairs into the purpose built building.

As with all these types of installation, the plant equipment was installed into the building with little space between items and on a number of different levels.  The management associated with the scheduling of the installation, installing certain items before others, and the coordination with other trades/contractors working in the same building, proved a challenge.  Our site engineers successfully installed all the equipment without loss or incident.

Slideshow image
For the past 5 years, Wright Engineering has been providing the UK Power Industry with a variety of services.  Our company has brought our materials handling expertise and our multi-skilled site installation personnel to work on a number of high profile projects at Power Station sites. We have worked at the following Power stations: • Ferrybridge • West Burton...