Wright Engineering have been at the forefront of cutting edge Engineering Design, Fabrication and Installation solutions for over 25 years. Based at our headquarters in North Nottinghamshire, Wright Engineering work around the world on complex design and engineering projects. Our philosophy of commitment to excellence and a continuing investment in the latest technologies ensure we remain a leader within our industry.

Ferrybridge
ferry1

In October 2007, Lentjes UK awarded Wright Engineering the contract to install the Limestone and Gypsum Handling Conveyors for the Fluidised Gas Desulphurisation Installation at Ferrybridge Power station.

The contract required us to install the free issue pipe conveyors that take the limestone from the rail unloading station into the power station, and the gypsum from the power station to the new Lafarge Plasterboard factory.

The conveyors are 361 metres long (Limestone) and 430 metres long (Gypsum).

ferry2

We installed the conveyors on an extremely congested site, alongside and over railway lines, roadways and buildings without any incidents or accidents, over a 7 month period. Our site management team worked with client management to ensure a smooth installation, integrating our needs and those of the many other contractors on site.

ferry3

The installation necessitated many large crane lifts, the largest being a tandem lift for the Limestone conveyor head end. Wright Engineering staff planned and executed the lift employing 500t and 450t capacity cranes to lift the 30t head end structure and land it on top of a silo 40m in height. Our site teams are fully qualified as appointed persons, banks men and slingers, enabling us to plan and supervise our own lifts without the need for contract lifts by crane operating companies.

Our client was so pleased with our performance at Ferrybridge that we were invited to tender for the equivalent installations at Fiddlers Ferry and Rugeley Power stations. Wright Engineering won these contracts and we are now installing the conveyor systems at both these sites.

Power

For the past 5 years, Wright Engineering has been providing the UK Power Industry with a variety of services. Our company has brought our materials handling expertise and our multi-skilled site installation personnel to work on a number of high profile projects at Power Station sites. We have worked at the following Power stations: • Ferrybridge • West Burton…