Wright Engineering have been at the forefront of cutting edge Engineering Design, Fabrication and Installation solutions for over 25 years. Based at our headquarters in North Nottinghamshire, Wright Engineering work around the world on complex design and engineering projects. Our philosophy of commitment to excellence and a continuing investment in the latest technologies ensure we remain a leader within our industry.

Limestone milk batching plant at Ferrybridge Power Station

Wright Engineering has just completed a project on behalf of Lentges at Ferrybridge Power Station.

LATEST UPDATE 21 July 2009

The equipment to provide an emergency supply of limestone solution to the FGD Equipment at Ferrybridge PowerStation was successfully installed and commissioned by Wright Engineering.

lime1

The equipment has been used extensively over recent months, to allow commissioning of the FGD Equipment to continue to plan, while limestone handling equipment is worked up to full availability.

lime2

The Milk Plant has received a number of visits by representatives from other UK PowerStation’s who are interested in the flexibility and security that this standby system provides.

lime3

We are now actively working on an enquiry from a UK Power Station which requires the tailoring of this system to integrate the equipment into an existing building and infrastructure. This will provide our client with an extremely cost effective solution to ensuring flue gasses remain within environmental limits, even when the main limestone supply/handling system fails.

lime4

Power

For the past 5 years, Wright Engineering has been providing the UK Power Industry with a variety of services. Our company has brought our materials handling expertise and our multi-skilled site installation personnel to work on a number of high profile projects at Power Station sites. We have worked at the following Power stations: • Ferrybridge • West Burton

LATEST NEWS

  • Wright Engineering Exhibiting at Hillhead Buxton -28-30th June 2016

        http://www.hillhead.com/exhibitors/wright-engineering-ltd?&azletter=W&searchgroup=libraryentry-exhibitors http://www.agg-net.com/equipment-services/wright-engineering-ltd        

  • Wright engineering contiune their working partnership with Clugstons at the Wilton RDF

    Wright engineering have recenetly completed the installation of 4, 17 tonne chute liners at the Wilton EFW facilaty on behalf of Clugstons, the chutes due to their size and weight had to be assembled in posistion from pre profiled plates, and then fully welded to seal and protect the concrete subbase. The works recently completed […]

  • Hemswell Biogas Hydraulic Arm installation

    Customer: Hemswell Biogas. Contract: To supply a mechanical arm to move waste from a designated pit into a material hopper, the arm has a 16mtr reach and will lift 1.5tonnes at full stretch and is capable of 20TPH, the machine is radio controlled and can either be operated from the floor level or from the […]

  • Conveyor C21 Replacement Hope Construction Materials Limited Dowlow Quarry

    Hope Construction Materials Ltd recent takeover of Dowlow Quarry near Buxton ensured the continued supply of high quality limestone material to their neighbour, Omya. The extracted material is of a very high grade and as such demand at a premium with the final product being used in the manufacture of pharmaceutical products as well as […]

CAREER OPPORTUNITIES

WANT TO KNOW MORE?

For more information on any of our Engineering Design, Fabrication and Installation Services / General Enquiries, please make your enquiry via the Enquiries Page. Alternatively you can contact us direct by telephoning 01909 730507, or by emailing us at enquiries@wrighteng.co.uk
Wright Engineering Logo Wright Demolition Equipment Logo Wright Fabrication Logo Wright Glass Logo Taylor Wright Logo Medi Right Logo Train Right Logo e Right Logo Recruit Wright Logo