Power
For the past 5 years, Wright Engineering has been providing the UK Power Industry with a variety of services. Our company has brought our materials handling expertise and our multi-skilled site installation personnel to work on a number of high profile projects at Power Station sites.
We have worked at the following Power stations:
• Ferrybridge
• West Burton
• Cottam
• Rugeley
• Fiddlers Ferry
Working for main contractors, or directly for the power station operator, we have:
• Installed Stone and DSG handling equipment including
• Pipe Conveyors
• Storage Hoppers and Silos
• Steel Framed and Clad Buildings
• Maintenance Access Platforms and Stairways
• Process Component Fabrications and Installation
• Planned Maintenance and Outage Labour
Our site installation teams are fully qualified and highly experienced. All site personnel hold “Passports to Safety” and our Site Supervisors and Managers hold IOSH Management of Safety qualifications.
As a company, we hold Achilles safety accreditation, and also ISO9001, providing assurance of our commitment to safety and quality.
We have the capability to provide this sector with turnkey installations, fabrications and component manufacture, and site labour, to a high quality at a very competitive price.
For further information on this sector please contact:
Martyn Cooke - Business Development Manager
Mob: 077717 211447
Email: martyn@wrighteng.co.uk
Related News
21 July 2009
Wright Engineering has just completed a project on behalf of Lentges at Ferrybridge Power Station.
LATEST UPDATE 21 July 2009
The equipment to provide an emergency supply of limestone solution to the FGD Equipment at Ferrybridge PowerStation was successfully installed and commissioned by Wright Engineering.
The equipment has been used extensively over recent months, to allow...
6 March 2009
A new operator cabin has recently been installed at Cottam Power Station to facilitate their rail unloading operations...........more soon.
1 August 2008
Ferry Bridge Conveyors
In October 2007, Lentjes UK awarded Wright Brothers the contract to install the Limestone and Gypsum Handling Conveyors for the Fluidised Gas Desulphurisation Installation at Ferrybridge Power station.
The contract required us to install the free issue pipe conveyors that take the limestone from the rail unloading station into the power station, and the gypsum...
30 April 2007
Wright Engineering have recently designed and built an Alternative Fuels Feed System for E.D.F. Energy. During pre-delivery tests it became apparent that belt tracking on the short flat reversing feed conveyor would be a problem and a reliable solution needed to be found.
After trying all the conventional methods known, with little success, the design team set to work on a fully...
Case History
2 June 2008
As part of the extensive refurbishment of Rugeley Power Station, Wright Brothers were contracted by Lentjes UK to install all the major equipment associated with the Waste Water Treatment Plant on the Station.
Our Site Team installed all pumps, tanks, silos and additive dosing equipment as well as maintenance access and stairs into the purpose built building.
As with all these types of...
1 October 2007
In October 2007, Lentjes UK awarded Wright Engineering the contract to install the Limestone and Gypsum Handling Conveyors for the Fluidised Gas Desulphurisation Installation at Ferrybridge Power station.
The contract required us to install the free issue pipe conveyors that take the limestone from the rail unloading station into the power station, and the gypsum from the power station...