Wright Engineering complete further installations for W2R project
Waste to Energy Project – MBT Facility
Main capabilities – Materials Handling –Belt Conveyors
- Fabrication / Installation – E.g. Access Ladders, Platforms, Chutes, Tanks, etc
- Installation of ‘Client ‘Turnkey Technology Packages’ – Percolators, Pre-Sort/Sort systems, etc
Case History – Client - W 2 R –Lancashire Waste Project – Leyland & Thornton sites
- Principle Contractor – Bovis Lend Lease
- Technology Provider – Global Renewables
Wright Engineering carried the following and ongoing work to these 2 principal site locations:
• Installation of 3 Percolators per site
• Fabrication/Installation of the flooring for both sites
• Installation of Reactor Walls for the Biomax on both sites
• Installation of 10 off – Plastic Scrubber Tanks to the Fan rooms
• Fabrication/Installation of the Acid Grillage & Access Ladder/platforms for both sites
• Value of work - £1.5m currently