< Back to Listing HOME > NEWS > New Ship Loader Cabin for Foster Yeoman at Glensanda.

New Ship Loader Cabin for Foster Yeoman at Glensanda.
3rd August 2006

New Ship Loader Cabin for Foster Yeoman at Glensanda.
New Ship Loader Cabin for Foster Yeoman at Glensanda.
New Ship Loader Cabin for Foster Yeoman at Glensanda.
New Ship Loader Cabin for Foster Yeoman at Glensanda.
New Ship Loader Cabin for Foster Yeoman at Glensanda.
Click images to enlarge
Wright Engineering of Worksop, Nottinghamshire have recently supplied a new ship loader operating cabin for harbour operations at Foster Yeoman’s Glensanda Quarry at Oban, Scotland.

Located on a 2,400 hectare estate on the remote West of Scotland, Glensanda is one of the largest hard rock quarry operations in Europe. It has in excess of 75 years of reserves at current production rates.  Its innovative quarrying methods and its dedicated shipping fleet efficiently produce and deliver crushed rock aggregate throughout Europe with the minimum of environmental impact.

Glensanda is connected to the sea by a 200 metre deep channel and provides a sheltered berth 24 hours each and every day for vessels with a draught of up to 14 metres.

The quarry provides a high quality, durable granite which is the ideal product for use in all types of civil engineering projects; currently Glensanda produces 6.8 million tonnes per annum, and areas have been designed to be able to produce up to 15 million tonnes in the future.

Reclaim, blending and ship loading facilities are rated at 6,000 tonnes per hour throughout, which means that a typical 86,000 tonne cargo can be loaded at the harbour in under 24 hours.

Wright replaced a basic existing cabin with a custom designed, double skinned & insulated operator’s cabin which was mounted to an existing tubular column with minor modifications to accept the new larger version.

A galvanised support frame & hand railing provide the infrastructure for the new 3.5mtr long x 2.0mtr wide x 2.5 mtr high cabin.

Painted to marine specification the cabin features double glazed windows throughout with the upper windows tinted, and crash protection to the lower ones.

Inside the cabin the operator is afforded a tip-up observation seat, windscreen wipers & washers, air conditioning system (cooling and heating) and a Hepa Filtration System.
A Gessman KST4 control chair with integrated joy-stick controls provide the operator with full control of the slew, feed rate and control of the conveyor extension which provides direct feed into the ship hold.

Additionally a bezel mounted tracker ball (mouse) mounted in the arm provides screen control on a 19” TFT screen providing a direct interface with the main quarry computer system. Communication to ship and plant is completed with VHF and UHF radios.
Colin MacFarlane, Glensanda Quarry’s Electrical Manager commented, “the replacement control cabin has provided a much improved work environment for our operators along with improvements in shiploading operations.

The high standard of cabin design, manufacture and installation planning by Wright Engineering ensured that the cabin was installed and commissioned well within the time allocated for the changeover, avoiding any costly delay’s to our shipping programme.”
 

Other News in Date Order

Expansion of existing workshop.
23rd November 2009

New headquarters building provides further expansion for Wright Engineering.
21st July 2009

Limestone milk batching plant at Ferrybridge Power Station
21st July 2009

Wright Engineering support the W2R Waste recycling Partnership.
21st July 2009

New operator cabin for rail unloading system at Cottam Power Station
6th March 2009

Upgrade for Lafarge Cement UK at their Cauldon Works.
4th March 2009

Huge project for Tarmac Tunstead rolls into production!
2nd March 2009

Sugar storage silos installation for Tate & Lyle
14th August 2008

New tube type conveyor system installed at Ferrybridge
1st August 2008

New Cement Storage Silo for Monier Lifetile
18th February 2008

More news on current Wright projects
27th September 2007

The Wright Way to Make Operating Easier at Tarmac Tunstead
3rd September 2007

Wright Engineering at Hillhead 2007
31st May 2007

Wright on track!
30th April 2007

Wright Engineering at the SED Exhibition 2007
31st January 2007

Lafarge Invest in new Roof Tile Collator.
31st January 2007

New Aggregate Storage Hoppers and Conveying System For Lafarge
1st December 2006

Wright Engineering complete Lafarge - Whitwell Quarry Project.
20th November 2006

New Ship Loader Cabin for Foster Yeoman at Glensanda.
3rd August 2006

Safety first at Wright Engineering
27th April 2006

Further success for Wright in Florida.
1st March 2006

Scunthorpe metal recovery plant.
8th January 2006

New Conveyor System for British Gypsum.
14th November 2005

Larger production facilities for Wright Engineering.
9th November 2005

Monier Lifetile picks the Wright System.
19th May 2004

Wright Completes Goonvean Conveyor System.
18th May 2004

New Mill Building for Lafarge - West Thurrock
8th December 2003

Wright Supply New Tile Embossing Machine.
7th January 2002

New Aggregate Storage Hopper for Aggregate Industries.
5th March 2001

Wright Replace Conveyor System for British Gypsum - Robertsbridge
22nd January 2001

New Aggregate In-Feed System for Redland Roofing Systems.
6th March 2000

New Aggregate Cement and Additive Supply Systems for Shawell Works.
14th February 2000

Wright Deliver Japanese Plant!
25th March 1998