< Back to Listing HOME > NEWS > Sugar storage silos installation for Tate & Lyle
Sugar storage silos installation for Tate & Lyle
14th August 2008
Tate & Lyle Sugar Conditioning Silo
In March 2008 we were invited to tender for a silo installation at Tate & Lyle’s Sugar Refinery at Silvertown, London. We were surprised on opening the tender documentation to find that the silo had a capacity of 12,500t of granulated sugar. All our staff were keen to take the challenge of working with a new client, in a new industrial sector, on such a large and unusual installation.
The silo was delivered from the French manufacturer ACMB in sections (nominally 3t in weight). It was to be our task to install the silo, which was to be over 20m in diameter and over 40m tall when complete, on prepared foundations within a congested refinery complex on the north bank of the River Thames.
Working with the Tate & Lyle management, we undertook to perform the installation on an open book, cost plus basis. Our Project managers preparing detailed costs for the tasks undertaken as well as the normal health and safety management on site have worked closely with the client to ensure a smooth and efficient installation.
Our site team prepared detailed lift plans and developed installation methods employing mobile tower cranes and various mobile cranes (50t to 500t capacity) to assemble the various sections of the silo.
On completion of the assembly, we then employed a team of welders to complete the welding of the silo sections, externally in mild steel, and internally in stainless steel, before the complete silo was clad in insulation and steel sheet cladding.
To complete the installation, we have been employed to install the conveyor system delivering sugar to the silo, and also the conveyor system that unloads the silo. We are also contracted to install the silo heating and air-conditioning systems as well as the dust extraction for the silo.
The Silo installation is required to be complete and ready for commissioning at the start of November 2008. We are currently confident that this date can be achieved.
Other News in Date Order
Limestone milk batching plant at Ferrybridge Power Station29th December 2008
Sugar storage silos installation for Tate & Lyle
14th August 2008
New tube type conveyor system installed at Ferrybridge
1st August 2008
New Cement Storage Silo for Monier Lifetile
18th February 2008
More news on current Wright projects
27th September 2007
The Wright Way to Make Operating Easier at Tarmac Tunstead
3rd September 2007
Wright Engineering at Hillhead 2007
31st May 2007
Wright on track!
30th April 2007
Wright Engineering at the SED Exhibition 2007
31st January 2007
Lafarge Invest in new Roof Tile Collator.
31st January 2007
New Aggregate Storage Hoppers and Conveying System For Lafarge
1st December 2006
Wright Engineering complete Lafarge - Whitwell Quarry Project.
20th November 2006
New Ship Loader Cabin for Foster Yeoman at Glensanda.
3rd August 2006
Safety first at Wright Engineering
27th April 2006
Further success for Wright in Florida.
1st March 2006
Scunthorpe metal recovery plant.
8th January 2006
New Conveyor System for British Gypsum.
14th November 2005
Larger production facilities for Wright Engineering.
9th November 2005
Monier Lifetile picks the Wright System.
19th May 2004
Wright Completes Goonvean Conveyor System.
18th May 2004
New Mill Building for Lafarge - West Thurrock
8th December 2003
Wright Supply New Tile Embossing Machine.
7th January 2002
New Aggregate Storage Hopper for Aggregate Industries.
5th March 2001
Wright Replace Conveyor System for British Gypsum - Robertsbridge
22nd January 2001
New Aggregate In-Feed System for Redland Roofing Systems.
6th March 2000
New Aggregate Cement and Additive Supply Systems for Shawell Works.
14th February 2000
Wright Deliver Japanese Plant!
25th March 1998


