< Back to Listing HOME > NEWS > Wright Engineering support the W2R Waste recycling Partnership.
Wright Engineering support the W2R Waste recycling Partnership.
21st July 2009
Wright Engineering is now supporting the W2R Waste recycling Partnership of Bovis Lend Lease, Minproc and Lancashire County Council in the installation of two large Waste Recycling Facilities.
The sites for this multi billion pound project are at Leyland and Thornton on brown field sites.
Wright Engineering have been conducting the installation of the waste percolators at both sites. The percolators are the core to the waste process and there are three units at each location. With a length of over 20 metres and an internal diameter of over 5 metres, the installation has been a challenge.
The installation of the large shaft assembly (27t) to tight tolerances has been successfully carried out to the six units.
In addition, Wright Engineering won the contract to supply all the connecting chute work and plate work to both sites. This contract, which is an ex works fabrication contract to supplied drawings, will have a value of close to £1m on completion.
We are fabricating, shotblasting and paint finishing to a high standard all required chutework, prior to shrink-wrapping and palletizing for delivery to the client.
Other News in Date Order
Expansion of existing workshop.23rd November 2009
New headquarters building provides further expansion for Wright Engineering.
21st July 2009
Limestone milk batching plant at Ferrybridge Power Station
21st July 2009
Wright Engineering support the W2R Waste recycling Partnership.
21st July 2009
New operator cabin for rail unloading system at Cottam Power Station
6th March 2009
Upgrade for Lafarge Cement UK at their Cauldon Works.
4th March 2009
Huge project for Tarmac Tunstead rolls into production!
2nd March 2009
Sugar storage silos installation for Tate & Lyle
14th August 2008
New tube type conveyor system installed at Ferrybridge
1st August 2008
New Cement Storage Silo for Monier Lifetile
18th February 2008
More news on current Wright projects
27th September 2007
The Wright Way to Make Operating Easier at Tarmac Tunstead
3rd September 2007
Wright Engineering at Hillhead 2007
31st May 2007
Wright on track!
30th April 2007
Wright Engineering at the SED Exhibition 2007
31st January 2007
Lafarge Invest in new Roof Tile Collator.
31st January 2007
New Aggregate Storage Hoppers and Conveying System For Lafarge
1st December 2006
Wright Engineering complete Lafarge - Whitwell Quarry Project.
20th November 2006
New Ship Loader Cabin for Foster Yeoman at Glensanda.
3rd August 2006
Safety first at Wright Engineering
27th April 2006
Further success for Wright in Florida.
1st March 2006
Scunthorpe metal recovery plant.
8th January 2006
New Conveyor System for British Gypsum.
14th November 2005
Larger production facilities for Wright Engineering.
9th November 2005
Monier Lifetile picks the Wright System.
19th May 2004
Wright Completes Goonvean Conveyor System.
18th May 2004
New Mill Building for Lafarge - West Thurrock
8th December 2003
Wright Supply New Tile Embossing Machine.
7th January 2002
New Aggregate Storage Hopper for Aggregate Industries.
5th March 2001
Wright Replace Conveyor System for British Gypsum - Robertsbridge
22nd January 2001
New Aggregate In-Feed System for Redland Roofing Systems.
6th March 2000
New Aggregate Cement and Additive Supply Systems for Shawell Works.
14th February 2000
Wright Deliver Japanese Plant!
25th March 1998


