Wright Engineering have been at the forefront of cutting edge Engineering Design, Fabrication and Installation solutions for over 25 years. Based at our headquarters in North Nottinghamshire, Wright Engineering work around the world on complex design and engineering projects. Our philosophy of commitment to excellence and a continuing investment in the latest technologies ensure we remain a leader within our industry.

Sugar storage silos installation for Tate & Lyle

Tate & Lyle Sugar Conditioning Silo. In March 2008 we were invited to tender for a silo installation at Tate & Lyle’s Sugar Refinery at Silvertown, London. We were surprised on opening the tender documentation to find that the silo had a capacity of 12,500t of granulated sugar. All our staff were keen to take the challenge of working with a new client, in a new industrial sector, on such a large and unusual installation.

The silo was delivered from the French manufacturer ACMB in sections (nominally 3t in weight). It was to be our task to install the silo, which was to be over 20m in diameter and over 40m tall when complete, on prepared foundations within a congested refinery complex on the north bank of the River Thames.

tat1

Working with the Tate & Lyle management, we undertook to perform the installation on an open book, cost plus basis. Our Project managers preparing detailed costs for the tasks undertaken as well as the normal health and safety management on site have worked closely with the client to ensure a smooth and efficient installation.

Our site team prepared detailed lift plans and developed installation methods employing mobile tower cranes and various mobile cranes (50t to 500t capacity) to assemble the various sections of the silo.

tat2

On completion of the assembly, we then employed a team of welders to complete the welding of the silo sections, externally in mild steel, and internally in stainless steel, before the complete silo was clad in insulation and steel sheet cladding.

To complete the installation, we have been employed to install the conveyor system delivering sugar to the silo, and also the conveyor system that unloads the silo. We are also contracted to install the silo heating and air-conditioning systems as well as the dust extraction for the silo.

The Silo installation is required to be complete and ready for commissioning at the start of November 2008. We are currently confident that this date can be achieved.

tat3

LATEST UPDATE:

It was a tough task, but our experienced site engineers completed the installation of the 12,000t Capacity Sugar Silo in time for the November 2009 first fill.

Tate & Lyle needed the Silo fully commissioned ready for the Christmas period. This was achieved, allowing the refinery to produce efficiently over the reduced demand period saving Tate & Lyle considerable lost revenue.

The silo now stands by the side of the Thames, a new local landmark, resplendent in the clean cladding a bright Tate & Lyle logo.

Wright Engineering have received excellent feedback from the clients management team, and we are hoping to work for Tate & Lyle on other projects in the very near future.

tat4

Agriculture & Food

With expertise gained from working on major sites in the traditional markets of Quarrying , Power Generation, Waste and Construction Materials has played a major part in their successful bid for recent contracts in the agricultural Industry. The demands of major project sites are prevalent on all major Grain and Agriculture Project sites with the necessary Work Method Statements, Risk

LATEST NEWS

  • Wright Engineering Exhibiting at Hillhead Buxton -28-30th June 2016

        http://www.hillhead.com/exhibitors/wright-engineering-ltd?&azletter=W&searchgroup=libraryentry-exhibitors http://www.agg-net.com/equipment-services/wright-engineering-ltd        

  • Wright engineering contiune their working partnership with Clugstons at the Wilton RDF

    Wright engineering have recenetly completed the installation of 4, 17 tonne chute liners at the Wilton EFW facilaty on behalf of Clugstons, the chutes due to their size and weight had to be assembled in posistion from pre profiled plates, and then fully welded to seal and protect the concrete subbase. The works recently completed […]

  • Hemswell Biogas Hydraulic Arm installation

    Customer: Hemswell Biogas. Contract: To supply a mechanical arm to move waste from a designated pit into a material hopper, the arm has a 16mtr reach and will lift 1.5tonnes at full stretch and is capable of 20TPH, the machine is radio controlled and can either be operated from the floor level or from the […]

  • Conveyor C21 Replacement Hope Construction Materials Limited Dowlow Quarry

    Hope Construction Materials Ltd recent takeover of Dowlow Quarry near Buxton ensured the continued supply of high quality limestone material to their neighbour, Omya. The extracted material is of a very high grade and as such demand at a premium with the final product being used in the manufacture of pharmaceutical products as well as […]

CAREER OPPORTUNITIES

WANT TO KNOW MORE?

For more information on any of our Engineering Design, Fabrication and Installation Services / General Enquiries, please make your enquiry via the Enquiries Page. Alternatively you can contact us direct by telephoning 01909 730507, or by emailing us at enquiries@wrighteng.co.uk
Wright Engineering Logo Wright Demolition Equipment Logo Wright Fabrication Logo Wright Glass Logo Taylor Wright Logo Medi Right Logo Train Right Logo e Right Logo Recruit Wright Logo