Project Details
- Client: AlignJV
- Contract Name: WTP Transfer Pipework & Pontoons
- Contract Value: £235k
- Contract Duration: 4 Weeks
Project Description
The works included the supply & installation of necessary elements to connect the sedimentation pond to the attenuation pond (Pond’s 1 & 2) to the water treatment plant located in South portal compound of AlignJV. Once connected Wright Engineering also supplied EC&I for the control levels via 4x submersible pumps installed in the 3 water treatment ponds.
This included the supply of over 170mtrs of black pipework, jointed by electro fusion connections all of which being hydrostatically pressure tested at 10Bar for a duration of at least 1 hour.
Wright Engineering also supplied and installed 3x pontoons using Wardle Marine Services ‘modular cubes’ connected to a fabricated frame.
The company continuous to demonstrate that is has the requisite skill and expertise to execute a wide variety of projects for the mammoth HS2 project and it looks forward to working with AlignJV in the future.