Client: Drax Power
Contract Name: Pedestrian Foot Bridge
Contract Value: £140,000
Contract Duration: 4 Months
Project Description
The new permanent bridge is to replace an existing temporary scaffold bridge. This links a low-level smoking area to the upper level within the coal transfer house and passes up and over a set of train lines.
Challenges were faced upon discovery of below ground services leading to alternative civil design further complicating the construction of the bridge.
Un-phased by the challenges faced the bridge was successfully installed on time and on budget to the delight of the client.