Whitwick Engineering
Project Details
Client: Whitwick Engineering
Contract Name: Control Cabin
Contract Value: £69,000
Contract Duration: 3 months
Project Description
Wright Engineering were approached by Whitwick Engineering to design, manufacture and install 2 no. control cabins for Immingham Docks rail load-out station.
One of which was for operator control and the second for MCC siting. Requirements were that of a typical Wright Engineering control cabin featuring floor to ceiling glass, operator control seating, HVAC, dimmable lighting and sound/ thermal insulation.
Design although bespoke, was complete exceeding expectations teamed with quality manufacture and a seamless installation.