Contract Name
C1 Conveyor Replacement
Contract Value
£251,000
Contract Duration
4 months
PROJECT DETAILS
With an aging conveyor critical to plant production, Hope Construction approached Wright Engineering with a challenge to design, supply and install a replacement conveyor keeping downtime to a maximum of 24 hours.
Undeterred by the challenge, Wright Engineering engineered a civil package and 94m long conveyor allowing almost complete installation to take place without taking the existing conveyor out of service.
The 24-hour shutdown was successfully adhered to and this project remains one of the company’s greatest achievements.